The CALDARERA FORMULA Calculating the Daily Rate of the Contractor

机译:Caldarera公式计算承包商的每日率

获取原文
获取原文并翻译 | 示例
           

摘要

It is not uncommon to face Owner opposition on a delayed or disrupted construction project when attempts to quantify a delay are presented. Even when schedule analyses that prove the number of entitled compensable delay days are offered, the argument regarding remuneration for economic loss becomes a point of contention. Existing formulas that purport to determine a Daily Rate consider the total work program of the Contractor. Such methods of establishing a Daily Rate are not project specific, and are imposing to the Contractor. The CALDARERA FORMULA is project specific, and simplifies the evaluation of the Daily Rate by using contractual mechanisms, such as the Baseline Schedule and Schedule of Values, which identify the original Contract Time and Contract Sum, respectively. Contractually, the Schedule of Values is to be used to establish all payments under the contract. Thus, a simple arithmetic calculation to quantify the Daily Rate of the Contractor is enabled. The CALDARERA FORMULA is simple, compliant with the Contract Documents, and easily explained.
机译:面对延迟或中断的建筑项目时,在延迟或中断的建筑项目呈现延迟时,这并不罕见。即使在提出有权获得赔偿日的数量的时间表分析时,有关经济损失酬金的论点也成为争论点。旨在确定每日税率的现有公式考虑承包商的总工作方案。建立日期率的这种方法不是项目特定的,并强加承包商。 Caldarera公式是项目特定的,并通过使用合同机制来简化每日率的评估,例如分别识别原始合同时间和合同总和的基线时间表和价值观。合同上,价值观将用于建立合同下的所有付款。因此,启用了用于量化承包商的每日速率的简单算术计算。 Caldarera公式简单,符合合同文件,并轻松解释。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号