Lessons Learned - Schedule Communication Using P6

机译:经验教训 - 使用P6安排沟通

获取原文
获取原文并翻译 | 示例
           

摘要

In order for any schedule to be an effective and useful management tool, the schedule must be communicated in the appropriate format to each of the various project stakeholders. If the Contract Documents require the use of Oracle Primavera P6, it is important for the scheduler to understand how to use the various P6 graphical and tabular tools in order to tailor the format to meet each stakeholder's needs and requirements. This paper will identify common scheduling specification requirements, as well as field requirements, for communicating project data and discuss how to use the tools available in Oracle Primavera P6 to meet these requirements. The scheduler should be able to apply the "Lessons Learned" outlined in this paper to create reports and layouts effectively and efficiently to communicate the schedule.
机译:为了使任何计划是有效和有用的管理工具,必须将计划以适当的格式传送给各种项目利益相关者。 如果合同文件需要使用Oracle Primavera P6,则调度程序了解如何使用各种P6图形和表格工具,以定制格式以满足每个利益相关方的需求和要求。 本文将确定共同调度规范要求,以及用于传播项目数据的现场要求,并讨论如何使用Oracle Primavera P6中提供的工具以满足这些要求。 调度程序应该能够应用本文中概述的“经验教训”,以有效和有效地创建报告和布局以传达计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号