首页> 外文期刊>Advanced Science Letters >GIS-Based Optimization Method for Utilizing Coal Remaining Resources and Post-Mining Land Use Planning: A Case Study of PT Adaro Coal Mine in South Kalimantan
【24h】

GIS-Based Optimization Method for Utilizing Coal Remaining Resources and Post-Mining Land Use Planning: A Case Study of PT Adaro Coal Mine in South Kalimantan

机译:基于GIS的利用煤炭剩余资源和矿岗后土地利用规划的优化方法 - 以南荷马坦南部Pt Adaro煤矿为例

获取原文
获取原文并翻译 | 示例
           

摘要

Resource of the coal maining is defined as the last remaining condition of the resources and reserves of coal when the coal companies have already completed the life of the mine or the expiration of the licensing contract (in accordance with government permission). This research usesapproach of knowledge-driven GIS based methods mainly Analytical Hierarchy Process (AHP) and Fuzzy logic for utilizing coal remaining resources and post-mining land use planning. The mining area selected for this study belongs to a PKP2B (Work Agreement for Coal Mining) company named PT AdaroIndonesia. The result shows that geologically the existing formation is dominated by Coal Bearing Formation (Warukin Formation) which allows the presence of coal remaining resources potential after the lifetime of mine, and the suitability of rubber plantation for the optimization of landuse in all mining sites and also in some disposal places in conservation areas and protected forests.
机译:当煤炭公司已经完成了矿山的生命或许可合同届满时,煤炭势力的资源被定义为煤炭资源和储量的最后剩余条件,或者按照政府许可的届满)。 本研究利用了知识驱动的GIS基于方法的方法,主要是分析层次处理(AHP)和模糊逻辑,用于利用煤炭剩余资源和挖掘后土地利用规划。 选择本研究的采矿区属于PKP2B(煤炭开采的工作协议)公司名为PT Adaroindonesia的公司。 结果表明,地质上现有的形成由煤轴承形成(Warukin形成)主导,这允许在矿山的寿命后占煤剩余资源潜力,以及橡胶种植园在所有采矿地区优化土地利用的适用性 在一些处置区和保护林中的处置场所。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号