...
首页> 外文期刊>Australian Geomechanics >THE TUAS WEST EXTENSION CONTRACTS 1686 & 1687 - HIGHLY VARIABLE JURONG FORMATION, KARSTIC CAVITIES, AND LARGE BORED PILE AND BARRETTE CONSTRUCTION
【24h】

THE TUAS WEST EXTENSION CONTRACTS 1686 & 1687 - HIGHLY VARIABLE JURONG FORMATION, KARSTIC CAVITIES, AND LARGE BORED PILE AND BARRETTE CONSTRUCTION

机译:TUAS West Extension合同1686和1687 - 高度可变的裕廊形成,岩峰腔和大型无聊桩和禁区建设

获取原文
获取原文并翻译 | 示例
           

摘要

The $3.5B Tuas West Extension (TWE) in Singapore extended the mass rapid transit (MRT) East-West Line 7.5 km from the existing Joo Koon Station to near the Tuas Second Link to Malaysia. C1686 and 1687 were two of the four TWE main civil works contracts. This paper looks at the high variability of the Jurong Formation and karstic solution cavities found, as well as construction aspects of the large diameter bored piles and barrettes up to about 60+ m depth.
机译:新加坡的3.5亿美元Tuas West Extension(TWE)延长了大众迅速过境(MRT)East-Wentre0.5公里距离现有的Joo Koon Station到Tuas第二链接到马来西亚附近。 C1686和1687是四个TWE主要民事工程合约中的两个。 本文探讨了裕廊形成和发现的岩溶液体的高可变性,以及大直径钻孔桩的施工方面,并达到约60+米深度的炮弹。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号