...
首页> 外文期刊>Energy Source & Distribution >BATTERY STORAGE KEY TO MANAGING GENERATION IN VICTORIA
【24h】

BATTERY STORAGE KEY TO MANAGING GENERATION IN VICTORIA

机译:在维多利亚州管理一代的电池储存钥匙

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

connecting even some of the proposed generation in Victoria will exceed the network capability of the local transmission network, according to data modelled by the australian Energy market operator (aEmo). The aEmo's Victorian Annual Planning Report (VapR) called for more investment to upgrade the electricity network as plans for wind and solar plants are developed in Victoria's north-west. Upgrades would include building transmission lines and installing batteries to store electricity generated at times when there is not enough capacity to transport the power to consumers, so it can be stored until congestion eases.
机译:根据澳大利亚能源市场运营商(AEMO)建模的数据,连接甚至维多利亚的一些建议的拟议一代将超过本地传输网络的网络能力。 Aemo的维多利亚时代的年度规划报告(VAPR)呼吁更多投资将电力网络升级为风和太阳能厂的计划是在维多利亚西北开发的。 升级将包括构建传输线路和安装电池,以存储有时会产生电力,当没有足够的容量来将电力运送到消费者时,可以存储,直到拥塞缓解。

著录项

  • 来源
    《Energy Source & Distribution》 |2016年第julaauga期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号