首页> 外文期刊>Engineering & Mining Journal >Exploration Generating Positive Results at 2 Endeavour Projects
【24h】

Exploration Generating Positive Results at 2 Endeavour Projects

机译:探索在2个努力项目中产生积极结果

获取原文
获取原文并翻译 | 示例
           

摘要

Endeavour Mining has reported very positive results from major exploration drilling programs near its Hounde mine in Burkina Faso and at its Fetekro exploration property in north-central Cote d'lvoire. At Hounde, Endeavour has drilled 203,900 meters (m) over the past 18 months on the large Kari gold-in-soil anomaly west of the mine. A maiden resource estimate for the Kari Pump deposit has increased Hounde's measured and indicated resources by 40%, while adding high-grade material.
机译:努力挖掘已经报告了在布基纳法索的霍普矿附近的主要勘探钻探计划中的积极成果,并在北中央Cote D'Lvoire的Fetekro探索物业附近。 在Hounde,努力在过去的18个月里钻了203,900米(M),在矿井以西的大型卡里金土壤异常。 Kari泵矿床的少女资源估算增加了霍波雷的测量并指出了40%,同时加入了高档材料。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号