首页> 外文期刊>Mining Engineering >Meeting the challenge in Pakistan's Lower Himalayas with the use of TBMs
【24h】

Meeting the challenge in Pakistan's Lower Himalayas with the use of TBMs

机译:在使用TBMS的情况下迎接巴基斯坦较低的喜马拉雅山挑战

获取原文
获取原文并翻译 | 示例
           

摘要

The Neelum Jhelum Hydro Electric project is located in the Muzaffarabad district of Azad Jammu and Kashmir (AJK), in northeastern Pakistan within the Himalayan foothill zone known as the Sub-Himalayan Range. The terrain is rugged with ground elevations that range from 600 to 3,200 m (2,000 to 15,000 ft) above sea level. The project is a run-of-river scheme, employing 28.6 km (17.7 miles) of headrace and 3.6 km (2.2 miles) of tailrace tunnels that bypass a major loop in the river system, for a total static head gain of 420 m (1,400 ft). The headrace tunnels' twin bores (69 percent) contain the tunnel boring machine (TBM) excavation (Fig. 1).
机译:该 尼兰 杰赫勒姆 水电 电 项目位于 阿扎德 查谟和克什米尔 ( AJK ) 的 穆扎法拉巴德 地区 , 东北 巴基斯坦 被称为 子 喜马拉雅山脉 喜马拉雅 山麓 区域内 。 地形崎岖,地面高度范围为海拔600至3,200米(2,000至15,000英尺)。 该项目 运行 的 河流 的方案 , 采用 尾水 隧洞 引水 的 28.6公里 (17.7 英里), 3.6公里( 2.2英里 ) 绕过 的 水系 主循环 , 为 420 米的 总 静压头 增益 ( 1,400英尺)。 头部隧道双孔(69%)包含隧道镗床(TBM)挖掘(图1)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号