...
首页> 外文期刊>Mining Engineering >Bill to force completion of land swap introduced
【24h】

Bill to force completion of land swap introduced

机译:裁决迫使换土地交换的账单介绍

获取原文
获取原文并翻译 | 示例
           

摘要

U.S. REP. RICK Nolan introduced a bill that could advance PolyMet's copper-nickel mine in northeastern Minnesota by forcing the land swap needed for the project. The Associated Press reported that PolyMet would get 6,650 acres of federal land in the Superior National Forest in exchange for a similar amount of private land that would be added to the national forest. PolyMet already holds the minerals rights to the land in question but cannot proceed with its mine without also owning the surface rights.
机译:美国代表。 Rick Nolan介绍了一项法案,可以通过强迫该项目所需的土地交换来推进Minnesota东北部的Permitet的铜镍矿。 联邦新闻报道称,多元化的美国森林将获得6,650英亩的联邦土地,以换取类似金额的私人土地,该私人土地将被添加到国家森林中。 聚合物已经将矿物质权利持有境内的矿物质权利,但不能与其矿井进行,而不会拥有方面权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号