...
首页> 外文期刊>North American oil & gas pipelines >Fill’Er Up The Importance of Properly Planning Project Fueling Needs
【24h】

Fill’Er Up The Importance of Properly Planning Project Fueling Needs

机译:填补正确规划项目加油需求的重要性

获取原文
获取原文并翻译 | 示例
           

摘要

On any pipeline project there are a myriad of cost factors that a contractor must consider.One near the top of that list is fuel.Think about it for a minute.When heading into a project,a contractor's equipment costs and personnel costs are generally understood,and they comprise the two greatest expenses on any given project.Key to getting people and equipment from the yard to the project and working,is fuel.By some estimates,fuel can be the third greatest expense for a contractor.It also represents a cost factor that can fluctuate depending on the location,weather,length of a project and other socioeconomic factors.Aside from the cost aspect of fueling the pipeline construction equipment,it can also be a logistical nightmare.A contractor,nor the community where the work is taking place,does not want a train of workers pulling their super duty work trucks into the local Speedway or Citgo station.Those stations have one — maybe two — diesel pumps and most don't have off-road diesel fuel available.And,because many of these large projects are in more rural areas,the stations are not adequately designed to accommodate large trucks and trailers.
机译:在任何管道项目上,有无数的成本因素,承包商必须考虑。该名单的顶部附近是Fuel.Think关于它的一分钟。当进入项目时,通常可以理解承包商的设备成本和人员费用,他们包括任何给定的项目的最大费用.Key以从院子到项目和工作的人员和工程工作,是燃料.BY估计,燃料可以是承包商的第三次最大费用。它也代表了一个可以根据位置,天气,项目的长度和其他社会经济因素波动的成本因素。从加油管道施工设备的成本方面,它也可以是一个物流噩梦。承包商,也不是工作的社区正在进行,不希望一辆工人将他们的超级工作卡车拉入当地的赛车场或花旗站。该网站有一个 - 也许二柴油泵,最多没有越野柴油燃料可用。而且,由于许多这些大型项目都在更多的农村地区,该车站无法充分设计用于容纳大型卡车和拖车。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号