...
首页> 外文期刊>Petroleum Economist >Bahrain LNG start-up may slide into 04-Teekay
【24h】

Bahrain LNG start-up may slide into 04-Teekay

机译:Bahrain Lng Start-Up可能会滑入04- Teekay

获取原文
获取原文并翻译 | 示例
           

摘要

The 8.25bn m3/yr Bahrain LNG receiving terminal may not come online until the fourth quarter of this year, according Mark Kremin, CEO of shipping firm Teekay LNG, which owns 30pc of the project and lOOpc of its floating storage unit (FSU). "The FSU has been on hire all year," says Kremin, citing issues with the onshore terminal for delays to the project, which was initially slated to come online in early 2019. "Based on things with long lead times, we are still looking at a second half of the year event."
机译:根据运输公司Teekay Lng的第四季度,8.25bn M3 / yr Bahrain LNG接收终端可能不会上网Teekay LNG的第四季度,它拥有其浮动储存单元(FSU)的项目和Loopc的30分。 “FSU全年都在雇用,”克雷明说,陆上终端的问题引用了延误的项目,最初在2019年初开始上网。“基于长期交货时间的事物,我们还在寻找 在今年的下半年活动。“

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号