...
首页> 外文期刊>Corrosion Engineering, Science and Technology >Wallwork invests 400 000 pounds in second vacuum carburising plant at Birmingham
【24h】

Wallwork invests 400 000 pounds in second vacuum carburising plant at Birmingham

机译:Wallwork在伯明翰的第二个真空渗碳厂投资40万磅

获取原文
获取原文并翻译 | 示例
           

摘要

Wallwork Heat Treatment (WHT) has invested in a second vacuum carburising and tempering facility at its Smallheath, Birmingham operation. This new plant, valued at more than 400 000 pounds, follows a 300 000 pounds investment at Wallwork's Bury facility last year. The new 1500 kg payload furnace at Birmingham further extends capacity in advanced heat treatment services at -the Smallheath site, and now enables customers to select from a range of techniques, extending from salt bath through conventional sealed quench case hardening to plasma nitriding and vacuum carburising. This new investment in advanced processes follows an investment in plasma nitriding at the Smallheath site 2 years ago.
机译:Wallwork Heat Treatment(WHT)已在其位于伯明翰的Smallheath的工厂投资了第二个真空渗碳和回火设备。这家新工厂的价值超过40万磅,是去年在Wallwork的Bury工厂投资了30万磅之后进行的。伯明翰的新型1500公斤有效负载炉进一步扩大了Smallheath站点的先进热处理服务能力,现在使客户可以选择多种技术,从盐浴到传统的密封淬火表面硬化,再到等离子渗氮和真空渗碳。这项对先进工艺的新投资是两年前在Smallheath工厂进行等离子氮化的投资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号