...
【24h】

Supply

机译:供应

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Inner Mongolia Tongliao government has announced the development status for the expansion project ofthe Inner Mongolia Jinlian aluminium smelter. The second stage expansion of Hangzhou Jinjiang Group'ssmelter has finished construction work, with reduction cells of 250ktpa capacity installed. Previous advice wasthat 50ktpa would be started in October to increase the operating production level from the estimated 830ktpa.Further installations are occurring, with AME expecting over 1.4Mtpa capacity in the first half of 2017. Atpresent, the smelter has spent CNY5.1bn (US$750m) on the project, with the fully realised smelter baseplanned to have a cost of around CNY34.3bn (US$5bn), if a previous figure of 3Mtpa aluminium is realised.
机译:内蒙古通辽市政府宣布了内蒙古金联铝冶炼厂扩建项目的发展状况。杭州锦江集团冶炼厂二期扩建工程已完成建设,安装了容量为250ktpa的还原池。先前的建议是,将在10月份启动50ktpa的产能,从估计的830ktpa的水平提高生产水平。正在进行进一步的安装,AME预计2017年上半年的产能将超过1.4Mtpa。目前,该冶炼厂已经花费了51亿元人民币(美国)。该项目投资了7.5亿美元,如果实现了之前3Mtpa铝的价格,则完全实现的冶炼厂基本计划成本约为343亿元人民币(50亿美元)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号