...
首页> 外文期刊>Asian oil and Gas >Breaking the ice on modular barriers
【24h】

Breaking the ice on modular barriers

机译:打破模块化障碍

获取原文
获取原文并翻译 | 示例
           

摘要

Exploration drilling in shallow water presents its own share of difficulties, but add interaction with sea ice into the equation and the challenge of designing platform concepts for such an environment is redoubled. Following involvement in shallow water projects in Bohai Bay, the North Sea and Nigeria, Hamburg-based IMPaC Offshore Engineering was contracted by Parker Drilling to take a hand in the development of an ice-resistant drilling barge for the north Caspian Sea.
机译:在浅水中进行勘探钻探有其自身的困难,但在方程式中增加了与海冰的相互作用,因此为这种环境设计平台概念的挑战加倍了。在参与渤海湾,北海和尼日利亚的浅水项目之后,派克钻井公司与总部位于汉堡的IMPaC Offshore Engineering签订了合同,着手开发北里海的耐冰钻井船。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号