...
首页> 外文期刊>Australian Geomechanics >REVIEW OF HIGHWALL MINING EXPERIENCE IN AUSTRALIA AND A CASE STUDY
【24h】

REVIEW OF HIGHWALL MINING EXPERIENCE IN AUSTRALIA AND A CASE STUDY

机译:澳大利亚高速公路采矿经验的回顾与案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

The highwall mining method was introduced in Australia in early 1991. Since then, at least 13 mines have used this method to mine coal. Abundant experience has been accumulated during the past 8 years, through some failures as well as successes. This paper presents a brief review of highwall mining experience at four Australian mines, with focus on geotechnical issues affecting mining performance. The paper also summarizes one case study, which involved major pillar/roof instabilities. The aim of the review and the case study is to assist the highwall mining industry to learn from past experience and to avoid similar instabilities in the future.
机译:1991年初在澳大利亚引入了高壁煤开采方法。从那时起,至少有13个矿井使用这种方法开采煤炭。在过去的8年中,通过一些失败和成功积累了丰富的经验。本文简要回顾了澳大利亚四个矿山的高墙采矿经验,重点是影响采矿性能的岩土工程问题。本文还总结了一个案例研究,其中涉及主要的支柱/屋顶不稳定性。审查和案例研究的目的是帮助高墙采矿业从过去的经验中学习,并避免将来出现类似的不稳定情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号