GROUND IMPROVEMENT USING DYNAMIC REPLACEMENT FOR NCIG CET3 COAL STOCKYARD

机译:动态更换NCIG CET3煤堆的地面改进

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents an overview of the geotechnical design considerations and various analytical work undertaken for the development of the 30 mega-ton per annum (Mtpa) coal stockyard area at the Coal Export Terminal 3 (CET3) on Kooragang Island, NSW. The coal stockyard of CET3 covers an area approximately 1.2 km long by 300 m wide. The site is underlain by soft compressible soil strata of variable thickness. To support the 21m high coal stockpiles and the stacker-reclaimer machinery loads, the upper ground required stabilisation/consolidation improvement. The original design of the proposed ground improvement was to use dredged sand fill won from the proposed berth and wharf facilities constructed for the project to progressively preload the ground and eliminate the majority of the stability concerns and consolidation settlements during the construction period. However, due to programme constraints and availability of dredged sand material, ground improvement by dynamic replacement (DR) was employed to reduce construction time and need for preload material. The project, believed to be the largest DR project completed in the Southern Hemisphere to date, was contracted to ground improvement specialist, Keller Ground Engineering on a design and construct basis, based on performance criteria to limit the post-construction settlements and satisfy the settlement criteria for machinery operation considerations. The process of the dynamic replacement work and the construction constraints of the ground improvement technique are presented.
机译:本文概述了在新南威尔士州Kooragang岛第3煤炭出口码头(CET3)上开发30吨/年(Mtpa)煤堆场区域的岩土工程设计注意事项和各种分析工作。 CET3的煤场长约1.2公里,宽300 m。该场地位于可变厚度的软性可压缩土壤层之下。为了支持21m高的煤炭库存和堆取料机的负荷,需要对地面进行稳定/加固处理。拟议的地面改善工程的原始设计是使用为该项目建造的拟建泊位和码头设施挖出的填沙,以逐步预压地面并消除施工期间的大部分稳定性问题和固结沉降。但是,由于程序限制和疏sand的砂料的可用性,采用了通过动态置换(DR)进行地面改良以减少施工时间和对预载料的需求。该项目被认为是迄今为止在南半球完成的最大的灾难恢复项目,根据性能标准,根据设计和建造合同,与地面改善专家Keller Ground Engineering签订合同,以限制施工后的沉降并满足沉降机械操作注意事项的标准。介绍了动态置换工作的过程以及地面改良技术的施工约束。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号