GEOTECHNICAL DESIGN AND CONSTRUCTION OF PORT OF BRISBANE MOTORWAY UPGRADE PROJECT

机译:布里斯班高速公路升级项目的岩土工程设计与施工

获取原文
获取原文并翻译 | 示例
           

摘要

The Port of Brisbane Motorway Upgrade project involves the construction of 6 km of new and duplicated motorway, delivered under a competitive double Early Contractor Involvement (dECI) model. The majority of the project is underlain by saturated soft soils up to 30 m deep, which presented various geotechnical challenges for performance of the road and interaction with fixed structures. A "tread lightly" observational risk based approach was adopted for the design and construction of embankments and ground improvement works. Initial settlement predictions were carried out using the Illicon procedure. Extensive instrumentation was installed, monitored and interpreted to provide improved post-construction settlement estimates.
机译:布里斯班港口高速公路升级项目涉及建设6公里的新高速公路和重复高速公路,并采用竞争性的早期承包商双重参与(dECI)模式交付。该项目的大部分都在深达30 m的饱和软土下,这对道路的性能以及与固定结构的相互作用提出了各种岩土挑战。路堤的设计和施工以及地面改善工程采用了“轻踩”的基于观察风险的方法。最初的沉降预测是使用Illicon程序进行的。安装,监控和解释了广泛的仪器,以提供改进的施工后沉降估算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号