The Cathedral Rocks Wind Farm is located on the south west coast of the Eyre Peninsula in South Australia, about 30 km from Port Lincoln (Figure 1). At this location the coast consists of cliffs up to 120 m high with the cliff top plateau gently falling away on the landward (NE) side to open grazing and farming country towards Port Lincoln. The Wind Farm consists of 33 Vestas V80 2 MW wind turbines which have a tower height of 60 m and a three blade rotor 80 m in diameter (Figure 2). The adopted footing for each turbine tower is a buried reinforced concrete pad 14.5 m square weighing approximately 640 t. The wind turbines are spread over a distance of about 9 km along the cliff top plateau. Associated infrastructure includes access and service roads, buried power and control cables, a control centre, a transformer and switchyard and a 132 kV transmission line connecting to the South Australian grid.
机译:Cathedral Rocks风电场位于南澳大利亚州艾尔半岛的西南海岸,距林肯港约30公里(图1)。在此位置,海岸由高达120 m的悬​​崖组成,悬崖顶高原在陆上(NE)一侧逐渐下降,从而向林肯港开放了放牧和农业之乡。风电场由33台Vestas V80 2 MW风力发电机组成,其塔高为60 m,三叶片转子的直径为80 m(图2)。每个涡轮机塔采用的立足点是一块重约640吨的14.5 m方形埋入式钢筋混凝土垫层。风力涡轮机沿着悬崖顶高原分布在大约9公里的距离上。相关基础设施包括通行和服务道路,地下电力和控制电缆,控制中心,变压器和开关站以及连接到南澳大利亚电网的132 kV输电线路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号