...
首页> 外文期刊>Australian Geomechanics >WEST PILEARA IRON ORE PROJECT, PORT OFF-LOADING FACILITY, ANKETELL POINT, WESTERN AUSTRALIA
【24h】

WEST PILEARA IRON ORE PROJECT, PORT OFF-LOADING FACILITY, ANKETELL POINT, WESTERN AUSTRALIA

机译:西皮列拉拉铁矿项目,西澳大利亚州安克泰尔角港口卸货设施

获取原文
获取原文并翻译 | 示例
           

摘要

API Management Pty Ltd (API), a 50/50 Joint Venture between Aquila Resources and AMCI propose to construct a multi-user port off-loading facility at Anketell Point in the Pilbara region of Western Australia, which will form part of the West Pilbara Iron Ore Project (WPIOP). The port off-loading facility will have an initial iron ore handling capacity of 30 million tonnes per annum. This paper describes the nearshore geotechnical investigations that have been completed at Anketell Point. It outlines the purpose of the investigations and provides a geotechnical account of the planning, occupational health and safety and operational aspects of the investigations that led to the successful completion and factual geotechnical reporting of the investigations within program and budget. An overview of the logging, field testing, on site sub-sampling, laboratory testing and the ground conditions is provided.
机译:API Management Pty Ltd(API)是Aquila Resources与AMCI之间的50/50合资企业,提议在西澳大利亚Pilbara地区的Anketell Point建造多用户港口卸货设施,该设施将成为West Pilbara的一部分铁矿石项目(WPIOP)。港口卸货设施的初始铁矿石处理能力为每年3000万吨。本文介绍了在Anketell Point完成的近岸岩土调查。它概述了调查的目的,并对调查的计划,职业健康与安全以及运营方面提供了岩土技术描述,从而使计划和预算范围内的调查得以成功完成并进行了岩土实际报告。提供了测井,现场测试,现场子采样,实验室测试和地面条件的概述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号