...
首页> 外文期刊>Australian Geomechanics >NCIG CET3 PROJECT--A GEOTECHNICAL PERSPECTIVE
【24h】

NCIG CET3 PROJECT--A GEOTECHNICAL PERSPECTIVE

机译:CET3项目之旅-土力工程学的视野

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents an overview of the complex geotechnical challenges faced during the design development of the Coal Export Terminal 3 (CET3) on Kooragang Island, NSW. The project encompasses the construction of coal export facilities which includes a new approximately 4.3 km railway loop leading to a coal unloading station before reaching a coal stockyard and wharf facilities of 30 Mtpa capacity. The works also include dredging in the southern arm of the Hunter River. The site is generally underlain by soft compressible alluvial soil strata of variable thickness. A summary of geotechnical investigations completed during the design development including test pits, boreholes, cone penetration tests and vibrocores is presented. A trial embankment was constructed to test the performance of the ground versus predicted movements and details of its construction and preliminary results are summarised. Geotechnical instrumentation was implemented to complement and monitor the construction activities. The paper also presents an overview of the geotechnical design philosophy addressing issues associated with railway embankment stability, ground improvement for the railway loop and stockyard areas.
机译:本文概述了新南威尔士州Kooragang岛的3号煤炭出口码头(CET3)设计开发过程中面临的复杂岩土工程挑战。该项目包括煤炭出口设施的建设,其中包括一条新的约4.3公里的铁路环路,该铁路环路通往卸煤站,然后到达煤炭堆场和容量为30 Mtpa的码头设施。这些工程还包括在猎人河南端的挖泥工程。该位置通常是由厚度可变的软性可压缩冲积土壤地层所覆盖。介绍了在设计开发过程中完成的岩土工程调查的摘要,包括试验坑,钻孔,圆锥体渗透试验和振芯。建造了一个试验路堤,以测试地面性能与预计的移动情况,并总结其构造细节和初步结果。实施了岩土工程仪器,以补充和监测施工活动。本文还概述了岩土设计理念,以解决与铁路路堤稳定性,铁路环路和堆场区域的地面改良有关的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号