首页> 外文期刊>International Journal of Rural Management >Issues before Evolving Energy Cooperative: Field Note from Leh, India
【24h】

Issues before Evolving Energy Cooperative: Field Note from Leh, India

机译:能源合作组织发展之前的问题:印度列城实地考察

获取原文
获取原文并翻译 | 示例
           

摘要

This note provides a field narrative about an emerging energy cooperative which was established with the mandate of supplying uninterrupted and clean electricity through solar photovoltaic unit. Formation of energy cooperative was one of the many dimensions of development intervention planned in the programme for 'Integrated development plan of Durbuk block using renewable energy resources', by implementing agencies. Field observations provided evidence that the cooperative was socially accepted. Theflip side of the burden on the cooperative members was in terms of financial cost—due to cost side technological skewness—in running and maintaining of the solar power unit. The study provides an insight into the social, economic and technological dimensions of programme intervention and their scope for rural development, rather than becoming encumbrance to social capital.
机译:本说明提供了有关新兴能源合作社的现场叙述,该合作社的成立旨在通过太阳能光伏装置供应不间断的清洁电力。能源合作社的形成是执行机构在“使用可再生能源进行的杜布克区块综合发展计划”计划中计划的发展干预的众多方面之一。现场观察提供了合作社被社会认可的证据。合作社成员负担的另一面是财务成本(由于成本方面的技术偏见),在运行和维护太阳能装置方面。这项研究提供了对方案干预的社会,经济和技术方面及其对农村发展范围的了解,而不是成为对社会资本的束缚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号