首页> 外文期刊>International Journal of Sustainable Manufacturing >Comparative life cycle assessment of 2.0 MW wind turbines
【24h】

Comparative life cycle assessment of 2.0 MW wind turbines

机译:2.0 MW风力发电机组的比较寿命周期评估

获取原文
获取原文并翻译 | 示例
           

摘要

Wind turbines produce energy with virtually no emissions, however, there are environmental impacts associated with their manufacture, installation, and end of life. The work presented examines life cycle environmental impacts of two 2.0 MW wind turbines. Manufacturing, transport, installation, maintenance, and end of life have been considered for both models and are compared using the ReCiPe 2008 impact assessment method. In addition, energy payback analysis was conducted based on the cumulative energy demand and the energy produced by the wind turbines over 20 years. Life cycle assessment revealed that environmental impacts are concentrated in the manufacturing stage, which accounts for 78% of impacts. The energy payback period for the two turbine models are found to be 5.2 and 6.4 months, respectively. Based on the assumptions made, the results of this study can be used to conduct an environmental analysis of a representative wind park to be located in the US Pacific Northwest.
机译:风力涡轮机产生的能量几乎没有排放,但是,风力涡轮机的制造,安装和寿命终止都会对环境造成影响。提出的工作研究了两台2.0 MW风力发电机的生命周期对环境的影响。两种型号均考虑了制造,运输,安装,维护和寿命终止,并使用ReCiPe 2008影响评估方法进行了比较。此外,还基于20年来累积的能源需求和风力涡轮机产生的能源进行了能源回收分析。生命周期评估表明,环境影响集中在制造阶段,占制造影响的78%。两种涡轮机模型的能源回收期分别为5.2个月和6.4个月。基于所做的假设,本研究的结果可用于对位于美国太平洋西北部的代表性风电场进行环境分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号