...
首页> 外文期刊>Engineering & Mining Journal >Doe Run cleans up Big River tailing site
【24h】

Doe Run cleans up Big River tailing site

机译:美国能源部清理大河尾矿场

获取原文
获取原文并翻译 | 示例
           

摘要

Jeffrey L. Zelms, president and CEO of Doe Run, believes the public accepted the tailings during the period in which they were created as a necessary trade-off to the jobs and other benefits brought by mining. "The operations behind those tailings created jobs and a better way of life for thousands of families. They supported schools and education, hospitals and libraries," Zelms said. "But the public opinion has changed since then," he said. "So when the EPA advised us that they expected us to help in the cleanup at the Big River, we agreed...
机译:Doe Run总裁兼首席执行官Jeffrey L. Zelms认为,公众在形成尾矿的过程中接受了尾矿,这是对采矿业带来的工作和其他收益的必要权衡。采尔姆斯说:“这些尾矿的开采活动为成千上万的家庭创造了就业机会,并改善了他们的生活方式。他们为学校和教育,医院和图书馆提供了支持。”他说:“但是从那以后,公众舆论发生了变化。” “因此,当美国环保署告知我们他们希望我们为大河的清理工作提供帮助时,我们同意...

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号