...
首页> 外文期刊>Engineering & Mining Journal >Vista Completes Paredones Amarillos Feasibility Study
【24h】

Vista Completes Paredones Amarillos Feasibility Study

机译:查看完成黄墙可行性研究

获取原文
获取原文并翻译 | 示例
           

摘要

Vista Gold announced in early September 2008 the results of a feasibility study prepared by SRK Consulting on Vista's wholly-owned Paredones Amarillos gold project located about 55 km south of La Paz, Baja California Sur, Mexico. The study proposes an open-pit mining operation that would produce 1.2 million oz of gold over a mine life of 9.5 years, including 142,900 oz/y during the first five years and an average of 127,400 oz/y over the life of the mine. Proven and probable reserves at the project total 37.95 million mt, grading 1.10 g/mt gold and containing 1.3 million oz of gold at 700 dollars/oz gold and a 0.4 g/mt cut-off. Pre-production capital costs to develop the Paredones Amarillos project are estimated at 196.7 million dollars. Life-of-mine cash operating costs are estimated at 419 dollars/oz of gold produced (388 dollars/oz during the first five years of operation). Operating costs are based on diesel prices effective as of May 2008 and energy prices effective as of the first quarter 2008.
机译:Vista Gold于2008年9月上旬宣布了SRK Consulting对Vista的全资拥有的Paredones Amarillos黄金项目进行可行性研究的结果,该项目位于墨西哥下加利福尼亚州拉巴斯以南约55公里。该研究提出了一种露天采矿作业,该作业将在9.5年的矿山寿命中产生120万盎司的金,包括前五年的142,900 oz / y,在矿山的寿命中平均为127,400 oz / y。该项目的已探明和可能的储量总计3,795万吨,品位为1.10克/吨黄金,其中包含130万盎司的黄金(每盎司700美元),边界品位为0.4克/吨。开发Paredones Amarillos项目的生产前资本成本估计为1.967亿美元。矿山生命期的现金运营成本估计为每生产黄金419美元/盎司(运营的头五年为388美元/盎司)。运营成本基于2008年5月生效的柴油价格和2008年第一季度生效的能源价格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号