...
首页> 外文期刊>Engineering & Mining Journal >BHP Billiton Plans Further Iron Ore Growth in Western Australia
【24h】

BHP Billiton Plans Further Iron Ore Growth in Western Australia

机译:必和必拓计划在西澳大利亚进一步发展铁矿石

获取原文
获取原文并翻译 | 示例
           

摘要

On January 29, BHP Billiton announced corporate approval for 1.93 billion dollars in early expenditures on Rapid Growth Project 6 (RGP6) for continuing growth at its Western Australian iron ore operations. BHP Billiton's share of the total will be 1.73 billion dollars. The funding will allow early procurement of long-lead-time items and detailed engineering to continue the expansion of the inner harbor at Port Hedland, progress rail track duplication works, and expand the Jimblebar mining operation. Approval for the balance of the capital required for RGP6 will be considered during the second half of the 2010. RGP6 is targeted for completion in 2013, at which time BHP Billiton's installed iron ore capacity in Western Australia will stand at 240 million mt/y. BHP Billiton's President-Iron Ore, Ian Ashby said, "This investment is the continuation of our long-term strategy of adding capacity in our high-quality iron ore business to support our confidence in the longer-term demand for iron ore globally.
机译:1月29日,必和必拓宣布公司批准为快速增长项目6(RGP6)的早期支出19.3亿美元,以继续其西澳大利亚铁矿石业务的增长。必和必拓的份额为17.3亿美元。这笔资金将用于早期采购长期交货的物品和详细的工程设计,以继续扩大黑德兰港的内港,进行铁路复制工作并扩大吉姆伯巴尔的采矿业务。 RGP6所需资金余额的审批将在2010年下半年进行。RGP6计划于2013年完成,届时必和必拓在西澳大利亚的铁矿石装机容量将达到2.4亿吨/年。必和必拓公司铁矿石总裁Ian Ashby表示:“这项投资是我们长期战略的延续,该战略是在我们的优质铁矿石业务中增加产能,以支持我们对全球铁矿石长期需求的信心。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号