...
首页> 外文期刊>Engineering & Mining Journal >Alacer Boosts Qopler Gold Heap-leach Capacity by 14%
【24h】

Alacer Boosts Qopler Gold Heap-leach Capacity by 14%

机译:Alacer将Qopler金堆浸容量提高了14%

获取原文
获取原文并翻译 | 示例
           

摘要

Alacer Gold plans to increase the capacity of the current heap-leach pad at its Copier gold mine in Erzincan province, eastern Turkey, by 14% to an ultimate capacity of 56 million metric tons (mt). The total cost of the expansion is estimated at $30 million. Alacer expects to spend $25 million of the expansion cost in 2015. Work is currently under way on a technical review to re-optimize the mine plan to take advantage of the new expanded heap leach capacity. Alacer expects to announce the results of this work toward the end of first quarter 2015.
机译:Alacer Gold计划将其位于土耳其东部Erzincan省Copier金矿的现有堆浸垫的产能提高14%,至5600万吨的最终产能。扩建的总成本估计为3,000万美元。 Alacer预计将在2015年花费2500万美元的扩建费用。目前正在进行技术审查,以重新优化矿山计划,以利用新的扩建堆浸能力。 Alacer希望在2015年第一季度末宣布这项工作的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号