...
首页> 外文期刊>GeoDrilling International >Bachy digs deep on Canary Wharf job
【24h】

Bachy digs deep on Canary Wharf job

机译:巴基(Bachy)对金丝雀码头的工作深有体会

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

GEOTECHNICAL specialist Bachy Soletanche Ltd (BSL) has constructed a concrete, circular shaft at London business district Canary Wharf, The ground-engineering firm has created the reinforced-concrete diaphragm wall at North Quay due to the shaft's depth of 47m. To retain verticality while the shaft was constructed, BSL required the use of a KS grab, which was sent across from Soletanche Bachy's HQ in France for the project. BSL operations manager Barry Osborn said: "For some of our recent diaphragm-wall projects we have used the rope-operated grab to install the panels, but the walls had depths of less than 30m. With the North Quay shaft requiring a deeper, 47m depth, we decided to utilise the KS grab. This is a hydraulic grab, designed and manufactured by Soletanche Bachy, which is fitted with instrumentation allowing verticality correction and therefore an ideal solution for the North Quay shaft project."
机译:土力工程专家Bachy Soletanche Ltd(BSL)在伦敦商业区金丝雀码头(Canary Wharf)建造了混凝土圆形竖井。由于竖井的深度为47m,地面工程公司在北码头(North Quay)创建了钢筋混凝土隔板墙。为了在竖井建造过程中保持垂直度,BSL需要使用KS抓斗,该抓斗是从Soletanche Bachy在法国的总部对面交付的。 BSL运营经理Barry Osborn说:“对于我们最近的一些隔板墙项目,我们使用绳索操作的抓斗来安装面板,但是墙的深度不到30m。北码头竖井需要更深的47m在深度方面,我们决定使用KS抓斗。这是由Soletanche Bachy设计和制造的液压抓斗,其配有可进行垂直度校正的仪器,因此是North Quay竖井项目的理想解决方案。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号