...
首页> 外文期刊>GeoDrilling International >Over 1 Mt of rock blasted in road improvement scheme
【24h】

Over 1 Mt of rock blasted in road improvement scheme

机译:超过1 Mt的岩石在道路改善方案中爆炸

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

ALBION Drilling Group recently completed the blasting of over 330,000m~3 of rock, 10,000m~2 of pre-split and 2,750m of stitch drilling during phase two of the A1/N1 Newry Bypass road improvement scheme. The works posed various technical difficulties due to the proximity of nearby homes, some of which were as close as 25m, and also by being adjacent to the main Belfast-to-Dublin railway line and the busy Newry bypass. This one-year contract, for Lagan Ferrovial JV, was won after successfully undertaking phase one - Dundalk to Newry - the previous year.
机译:ALBION钻探集团最近在A1 / N1纽里绕道修整计划的第二阶段中完成了超过330,000m〜3的岩石爆破,10,000m〜2的预裂和2750m的针迹爆破。由于附近房屋的靠近(其中一些房屋距离最接近25m)以及与贝尔法斯特至都柏林的主要铁路线和繁忙的纽里旁路的毗邻,工程带来了各种技术难题。前一年,Lagan Ferrovial合资公司签订了为期一年的合同,该合同是在成功进行了Dundalk到Newry的第一阶段之后赢得的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号