Drilling for Tiberon Minerals in Vietnam - an update

机译:越南泰伯龙矿山的钻探-更新

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In the February 2001 issue of geoDrilling International (page 14), widely experienced Australian drilling consultant Jervis Sparks reported on a minerals exploration drilling programme being carried out in Vietnam by Tiberon Minerals of Calgary Canada By December 2001, Tiberon Minerals had completed this, the largest wire-Tine drill programme ever in Vietnam. Jervis now reports: At the resumption of the drilling programme in March 2001 I was recalled to continue drill training and manage the drilling side of the project for Tiberon Minerals. This phase of the project involved infill drilling, using the same two LY38s and two LY34s, all wireline, operated by the Vietnamese drilling contractor DMTC. That was finished in July (7,500 m) and a new contract for an additional 6,000 m was signed and a fifth drill (LY34) joined the project. By this time it was mid-summer, with daily temperatures in the 40s. By October this contract had been completed, and further delineation drilling continued until 16,500 m were completed in December.
机译:在2001年2月出版的《国际地质钻探》(第14页)中,经验丰富的澳大利亚钻探顾问杰维斯·斯帕克斯报道了加拿大卡尔加里的泰伯隆矿业公司在越南进行的矿产勘探钻探计划。到2001年12月,泰伯伦矿业公司已经完成了该项目,这是最大的越南曾经进行过线锡钻探计划。 Jervis现在报道:在2001年3月恢复钻探计划后,我被召回,继续为Tiberon Minerals进行钻探培训并管理该项目的钻探方面。该项目的这一阶段涉及到填充钻探,使用相同的两个LY38和两个LY34,全部为电缆,由越南钻探承包商DMTC经营。该工程已于7月完成(7,500 m),并签署了新的6,000 m合同,第五钻(LY34)加入了该项目。那时是仲夏,每天气温在40摄氏度左右。到10月,该合同已经完成,进一步的轮廓钻探一直持续到12月完成16,500 m。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号