...
首页> 外文期刊>Global Gypsum Magazine >Scrubber project to create FGD gypsum continues to go well
【24h】

Scrubber project to create FGD gypsum continues to go well

机译:用于生产烟气脱硫石膏的洗涤塔项目进展顺利

获取原文
获取原文并翻译 | 示例
           

摘要

A US700m scrubber project that produces FGD gypsum at Allegheny Energy's Hatfield's Ferry Power Station in Pennsylvania and a routine maintenance shutdown of one of the plant's three power-generating units are creating noticeable changes in and outside the town.With approval from the state Department of Transportation (DOT),Allegheny Energy is installing a traffic signal on Route 21 at the plant's employee entrance to reduce the traffic congestion caused by the 1000 contract construction workers who enter and leave every day,along with the 170 regular employees.
机译:一项7亿美元的洗涤塔项目在宾夕法尼亚州的阿勒格尼能源公司(Allegheny Energy)的哈特菲尔德(Hatfield)轮渡发电站生产烟气脱硫石膏,并对该厂的三个发电单元之一进行例行维护停机,这在该镇内外产生了重大变化。 (DOT),阿勒格尼能源公司(Allegheny Energy)正在该工厂员工入口的21号公路上安装交通信号灯,以减少因每天有1000名合同建筑工人进出之路以及170名正式员工而造成的交通拥堵。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号