首页> 外文期刊>Global Cement Magazine >Melbourne Cement Facilities: Silo upgrade
【24h】

Melbourne Cement Facilities: Silo upgrade

机译:墨尔本水泥厂:筒仓升级

获取原文
获取原文并翻译 | 示例
           

摘要

The silos original configuration included a flat floor and the silo was built with a central diametric rotating screw extraction system. This delivered product to a central cement pump in the reclaim pit underneath the silo. After 4Mt was reclaimed from the silo, the system passed its use-by date and was failing to cope with demand. Maintenance was becoming increasingly difficult.
机译:筒仓的原始配置包括一个平坦的地面,筒仓采用中央直径旋转螺杆抽取系统建造。该产品将产品运送到筒仓下方回收坑中的中央水泥泵。从筒仓中回收4Mt后,系统已过了使用期限,无法满足需求。维护变得越来越困难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号