首页> 外文期刊>Global Cement Magazine >Problem solving at a UK cement plant
【24h】

Problem solving at a UK cement plant

机译:英国水泥厂的问题解决

获取原文
获取原文并翻译 | 示例
           

摘要

AUK cement plant operated a drag chain system for the transfer of a biomass-derived fuel into the kiln. The drag chain system pulled the material a total of 80m along a horizontal section and then up an inclined section. Since the commissioning of the plant in the recent past, the plant operator had experienced operational issues with the drag chain system.
机译:AUK水泥厂使用拖链系统将生物质衍生的燃料转移到窑中。拖链系统将物料沿水平段拉出总计80m,然后向上倾斜段。自从最近工厂投产以来,工厂运营商就遇到了拖链系统的运营问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号