...
首页> 外文期刊>Foster Natural Gas Report >INERGY MIDSTREAM'S NEWEST OPEN SEASON TARGETS MARCELLUS GAS SHIPPERS SEEKING MORE NORTH-SOUTH CAPACITY LINKING STAGECOACH STORAGE TO DOMINION TRANSMISSION
【24h】

INERGY MIDSTREAM'S NEWEST OPEN SEASON TARGETS MARCELLUS GAS SHIPPERS SEEKING MORE NORTH-SOUTH CAPACITY LINKING STAGECOACH STORAGE TO DOMINION TRANSMISSION

机译:能源中间流的最新开放季节目标Marcellus天然气运输商寻求更多的南北能力,将阶梯式教练的存储与统治权转移联系起来

获取原文
获取原文并翻译 | 示例
           

摘要

On 9/29/11 Inergy, LP1 announced that its wholly- owned subsidiary, Inergy Midstream, LLC, is conducting a non-binding Open Season for shippers desiring to transport incremental natural gas volume on the existing Stagecoach North and South laterals and to a new pipeline interconnect with Dominion Transmission (DTI). The existing North-South Project, which Inergy believes will be in service this month, will enable shippers to transport up to 325 MMcf/d of gas bi-directionally on a firm basis from the Millennium Pipeline to Tennessee Gas Pipeline’s 300 Line. The additional capacity expansion contemplated by the new open season would enable shippers to transport a greater gas volume bi- directionally on a firm basis over the same route covered by the North-South Project and also to DTI.
机译:在11年9月29日Inergy,LP1宣布其全资子公司Inergy Midstream,LLC正在为希望在现有Stagecoach北侧和南侧支路上运输增量天然气的运输商进行非约束性的开放季节。新管道与Dominion传输(DTI)互连。 Inergy认为,现有的南北项目将于本月投入服务,这将使托运人能够可靠地从千年管道到田纳西州天然气管道的300线双向输送高达325 MMcf / d的天然气。新的开放季节计划进行的额外产能扩张将使托运人能够坚定地双向运输更大的天然气量,穿越北南项目覆盖的同一条路线,并到达DTI。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号