...
首页> 外文期刊>Foster Natural Gas Report >Florida Power & Light Orchestrates Two Major Natural Gas Projects to Satisfy Demand in the U.S. Southeast -- Sabal Trail and the Florida Southeast Connector
【24h】

Florida Power & Light Orchestrates Two Major Natural Gas Projects to Satisfy Demand in the U.S. Southeast -- Sabal Trail and the Florida Southeast Connector

机译:佛罗里达电力与照明公司精心策划了两个满足美国东南部需求的大型天然气项目-Sabal Trail和Florida Southeast Connector

获取原文
获取原文并翻译 | 示例
           

摘要

On October 4, Sabal Trail Transmission, LLC (PF14-1) requested FERC to initiate an environmental review under the National Environmental Policy Act (NEPA) Pre-Filing Process for a greenfield natural gas pipeline and related facilities, dubbed the “Sabal Trail Project.” Sabal Trail plans to file a certificate application following completion of the pre-filing process. Filing of the certificate application is anticipated by the end of October 2014 and the scheduled in-service date for the initial phase at least is 5/1/17. Sabal Trail requested issuance of a final environmental document by August 2015 and a certificate order by November 2015, to facilitate commencement of construction in the second quarter of 2016.
机译:10月4日,Sabal Trail Transmission,LLC(PF14-1)要求FERC根据国家环境政策法(NEPA)的未开发天然气管道及相关设施的预备程序启动环境审查,这一过程被称为“ Sabal Trail项目” 。”在完成预申请流程后,Sabal Trail计划提交证书申请。预计将在2014年10月底之前提交证书申请,初始阶段的计划启用日期至少为5/1/17。 Sabal Trail要求在2015年8月之前发布最终的环境文件,并在2015年11月之前发布证书订单,以促进2016年第二季度的施工。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号