...
首页> 外文期刊>Foster Natural Gas Report >Both Florida Transportation Officials and Florida Gas Transmission Seem Ready for a FERC Ruling on Dilemma Arising from Competing Infrastructure Development
【24h】

Both Florida Transportation Officials and Florida Gas Transmission Seem Ready for a FERC Ruling on Dilemma Arising from Competing Infrastructure Development

机译:佛罗里达州交通运输官员和佛罗里达州天然气输送公司似乎已准备好就竞争基础设施建设引发的FERC裁决作出裁决。

获取原文
获取原文并翻译 | 示例
           

摘要

The Florida Department of Transportation (FDOT) recently urgechFERC to act expeditiously on the Florida Gas Transmission Co. (FGT) (CP06-9) petition on May 2 to postpone the abandonment of its 18- and 24-inch pipelines for up to 3 years, "ostensibly" to prevent the disruption of natural gas service should the FDOT order FGT to relocate the 36-inch replacement pipeline.
机译:佛罗里达运输部(FDOT)最近敦促FERC于5月2日对佛罗里达气体传输公司(FGT)(CP06-9)的请愿书迅速采取行动,将其18英寸和24英寸管道的弃置期限推迟3年,如果FDOT命令FGT搬迁36英寸替换管线,则“表面上”以防止天然气服务中断。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号