【24h】

Iranian LSAW demand set to rise

机译:伊朗LSAW需求将上升

获取原文
获取原文并翻译 | 示例
           

摘要

As expected last month, the onshore section of the IGD-E pipeline has now beenawarded. India’s Jindal SAW successfully picked up the project. The project wasawarded by the Spanish EPC contractor Tecnicas Reunidas and is for a 42” ODpipeline travelling for 114km. As expected, the offshore proportion of this pipetender, being awarded by the UAE’s National Petroleum Construction Company(NPCC) has been delayed. This tender is now understood to be in the final pricingstage, so should be awarded soon.
机译:正如上个月所预期的那样,IGD-E管道的陆上部分现已获得奖励。印度的Jindal SAW成功完成了该项目。该项目由西班牙EPC承包商Tecnicas Reunidas授予,用于42英寸OD管道,行程114公里。正如预期的那样,由阿联酋国家石油建设公司(NPCC)授予的该移液器的离岸比例已被推迟。现在已经知道该招标处于最终定价阶段,因此应尽快中标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号