首页> 外文期刊>MBR Welded Linepipe & OCTG Market Tracker >Russian mills begin to ship linepipe to the East
【24h】

Russian mills begin to ship linepipe to the East

机译:俄罗斯钢厂开始将管道输送到东方

获取原文
获取原文并翻译 | 示例
           

摘要

Gazprom expects to receive 120 kt of LSAW pipe in 2014 as it begins construction of its Power of Siberia project that will linkSiberian gasto China. These began to be shipped in August with Chelpipe now having already delivered 10 kt (with plate sourced from Magnitogorsk and Severstal) and Severstal Izhora 2,000 tonnes. Chelpipe in September and October are expecting to target 30kt. The shipments are all for LSAW to diameter of 1420mm (56") LSAW pipe with a wall thickness of 21.7mm.
机译:俄罗斯天然气工业股份公司(Gazprom)计划在2014年开始建设西伯利亚电力(Power of Siberia)项目,该项目将西伯利亚天然气与中国连接起来,预计将接收120 kt LSAW管。这些产品从8月开始装运,而Chelpipe现在已经交付了10 kt(钢板来自Magnitogorsk和Severstal)和Severstal Izhora 2,000吨。 9月和10月的Chelpipe预期目标为30kt。所有装运的都是LSAW,直径为1420mm(56“)LSAW管,壁厚为21.7mm。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号