首页> 外文期刊>Metal Bulletin >Yandi goes ahead with expansion to 25m tonnes
【24h】

Yandi goes ahead with expansion to 25m tonnes

机译:炎帝继续扩大到2500万吨

获取原文
获取原文并翻译 | 示例
           

摘要

BHP Iron Ore is to go ahead immediately with the expansion of its Yandi mine in Western Australia, which will see annual production of fines rise from 15m to 25m tonnes Although BHP has not signed long term contracts to cover the extra output, a spokesman said that the acceptance of the product has been nothing less than remarkable and that the company will have no trouble finding a home for the additional 10m tonnes Yandi began production only 314 years ago at the modest rate of 5m tpy and was expanded soon after to 10m and more recently to 15m tonnes, largely driven by demand for the fines.
机译:必和必拓铁矿石公司将立即着手扩大其在西澳大利亚的Yandi矿山,该矿山的年细粉产量将从1500万吨增加到2500万吨,尽管必和必拓尚未签署长期合同来支付额外的产量,一位发言人说。该产品的接受度无与伦比,并且公司将毫无困难地找到额外的1000万吨的家园。Yandi仅在314年前就以年产500万吨的适度速度开始生产,并在不久后扩大到1000万吨甚至更多最近到了1500万吨,主要是由于对罚款的需求。

著录项

  • 来源
    《Metal Bulletin》 |1996年第8054期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 冶金工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号