...
首页> 外文期刊>Mining Engineering >Hecla's Grouse Creek results will below expectations
【24h】

Hecla's Grouse Creek results will below expectations

机译:Hecla的Grouse Creek结果将低于预期

获取原文
获取原文并翻译 | 示例
           

摘要

Hecla Mining reported that its Grouse Creek gold mine has experienced higher than expected operating costs per ounce due to ower than anticipated gold grades, These costs has caused the company to re-evaluate the proven and probable re-serves at Grouse Creek and its effect on the economics of the project. Based on current information, this re-evaluation could result in a write-down of the property. Hecla holds an 80 percent interest in the mine and began commercial production in December 1994. It is located near Challis in central Idaho in the historic Yankee Fork Mining District. The Grouse Creek Mine consists of the Sun-beam deposit, which is currently being mined, and the Grouse deposit. During the third quarter of 1995, Grouse Creek milled 432.7 kt (477,000 st) of ore at an average grade of 1.3 g/t (0.036 oz/st) of gold for a total of 477 kg (15,336 oz) for Hecla's account. Durin the first nine months of 1995, Hecla' s share of Grouse Creek production was 1.57 t (50,534 oz), or 1 Mt (1.12 million st) of ore milled at an average grade of 1.6 g/t (0.046 oz/st). Drilling and ore reserve modeling of the deposit had shown much higher ore grades, Hecla said.
机译:Hecla Mining报告称,由于黄金品位比预期的要高,其Grouse Creek金矿的每盎司运营成本均高于预期。这些成本已导致该公司重新评估Grouse Creek的已探明和可能储量及其对矿产资源的影响。项目的经济效益。根据当前信息,此重新评估可能会导致资产减记。 Hecla拥有该矿80%的权益,并于1994年12月开始商业生产。它位于爱达荷州中部历史悠久的洋基福克采矿区的Challis附近。松鸡溪矿山由目前正在开采的日光矿床和松鸡矿床组成。在1995年第三季度,Grouse Creek开采了432.7 kt(477,000 st)矿石,平均品位为1.3 g / t(0.036 oz / st)黄金,总共为477 kg(15,336 oz)供Hecla使用。在Durin的1995年前9个月中,Hecla在Grouse Creek产量中所占的份额为1.57吨(50,534盎司),或以平均1.6 g / t(0.046 oz / st)的平均品位开采的1 Mt(112万st)矿石。 。 Hecla说,该矿床的钻孔和矿石储量模型显示出更高的矿石品位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号