...
首页> 外文期刊>Mining Engineering >Risk-management process for tailings control
【24h】

Risk-management process for tailings control

机译:尾矿控制的风险管理流程

获取原文
获取原文并翻译 | 示例
           

摘要

The design of tailings containment structures relies on well-understood engineering methods being applied consistently. Unfortunately, not all facilities are designed or managed to the same level of competency. To standardize procedures, the Mining Association of Canada (MAC, 1998) prepared a "Guide to Tailings Management." It recommended review of designs and an assessment of the risks associated with tailings impoundments be implemented during all phases of a mine life. This paper describes how the quantitative risk assessment (QRA) process can be used to define risks associated with the design, construction and operation of a tailings management facility. And it discusses how, once the risk tolerability curves (RTC) are defined for a project, they can assist the risk management (RM) process.
机译:尾矿围护结构的设计依赖于始终如一地应用的易于理解的工程方法。不幸的是,并非所有设施的设计或管理都具有相同的能力水平。为了使程序标准化,加拿大矿业协会(MAC,1998年)编写了“尾矿管理指南”。它建议在矿山寿命的所有阶段,对设计进行审查并评估与尾矿蓄积有关的风险。本文介绍了如何使用定量风险评估(QRA)流程来定义与尾矿管理设施的设计,建造和运营相关的风险。并且讨论了如何为项目定义风险承受能力曲线(RTC)后如何协助风险管理(RM)过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号