...
首页> 外文期刊>Mining Engineering >California WaterFix program enters crucial stage
【24h】

California WaterFix program enters crucial stage

机译:加州WaterFix计划进入关键阶段

获取原文
获取原文并翻译 | 示例
           

摘要

The proposed California WaterFix project, a $15.5 billion re-engineering of the Sacramento-San Joaquin Delta, is heading into a critical phase over the next year that could well decide if the project comes to fruition. The Sacramento Bee reported that the state Water Resources Control Board begins months of grueling public hearings on the details of the plan that would include the construction of a pair of massive tunnels beneath the heart of the Delta in Northern California that would help to shore up the reliability of water deliveries to millions of Southern Californians and San Joaquin Valley farmers.
机译:拟议中的加州WaterFix项目是对萨克拉曼多-圣华金河三角洲进行的155亿美元重新设计的工程,明年将进入关键阶段,该阶段很可能决定该项目是否会实现。萨克拉曼多蜜蜂报(Sacramento Bee)报道说,州水资源控制委员会开始了数月的艰苦听证会,以听取有关该计划细节的听证会,其中包括在北加州三角洲中心地区修建两条巨大的隧道,以帮助支撑向数百万南加州人和圣华金河谷农民供水的可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号