...
首页> 外文期刊>Mining Engineering >Ekati diamond mine--background and development
【24h】

Ekati diamond mine--background and development

机译:依卡提钻石矿-背景与发展

获取原文
获取原文并翻译 | 示例
           

摘要

BHP Diamonds is developing Canada's first diamond mine, Ekati, located in the Northwest Territories (NWT). The mine is a joint venure between manager and operator BHP (51%), Dia Met Minerals (29%), Charles Fipke (10%) and Stuart Blusson (10%). BHP Diamonds is part of BHP Minerals. Production at Ekati began Oct.14, 1998.The mine is situated on a 3,450-km{sup}2 (853,000-acre) claim block located in the Lac de Gras region of the NWT (Fig. 1). It is about 300km (185 miles) northeast of Yellowknife and 100 km (60 miles) south of the Arctic Circle.The seasonal winter ice road to Echo Bay's Lupin Mine passes along the eastern margin of the project area. This allows road access each year from mid-January to mid-April. For the remainder of the year the project is accessible only by air.
机译:必和必拓钻石公司正在开发加拿大第一座位于西北地区(NWT)的钻石矿Ekati。该矿山是经理和运营商必和必拓(51%),Dia Met Minerals(29%),Charles Fipke(10%)和Stuart Blusson(10%)的合资企业。必和必拓钻石公司是必和必拓矿业的一部分。 Ekati矿区的生产始于1998年10月14日。该矿区位于3WT的Las de Gras地区3,450 km {sup} 2(853,000英亩)索赔区块上(图1)。它位于耶洛奈夫(Yellowknife)东北约300公里(185英里)处,在北极圈以南100公里(60英里)处。通往Echo湾羽扇豆矿的季节性冬季冰雪路沿项目区的东边缘。这样一来,每年的1月中旬至4月中旬即可进入道路。在今年剩余的时间里,只能通过航空访问该项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号