...
首页> 外文期刊>Mining Engineering >FutureGen construction stopped again; DOE suspends funding for clean coal power plant
【24h】

FutureGen construction stopped again; DOE suspends funding for clean coal power plant

机译:FutureGen的建设再次停止;美国能源部暂停对清洁煤电厂的投资

获取原文
获取原文并翻译 | 示例
           

摘要

THE U.S. Department of Energy (DOE) suspended the majority of its planned funding for the FutureGen 2.0 project saying there is not enough time to complete the project before a required deadline under the 2009 federal stimulus package. DOE had pledged $1 billion to complete the $1.65 billion initiative. ClimateWire reported that the decision effectively ends construction plans for one of the most expensive and high-profile carbon capture proposals in the world.
机译:美国能源部(DOE)暂停了对FutureGen 2.0项目的大部分计划资金,称没有足够的时间在2009年联邦刺激计划规定的最后期限之前完成该项目。美国能源部已承诺投入10亿美元,以完成这一耗资16.5亿美元的计划。 ClimateWire报告称,该决定实际上终止了世界上最昂贵,最引人注目的碳捕集提案之一的建设计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号