The Sistema de Potabilizacion Area Norte project (Northern Area Purification System) was a major expansion of the potable water system in Buenos Aires Province, Argentina. The aim of the project was to transport and purify raw water from the Parana River to provide potable water for five communities in the northern part of the province, benefitting up to two million people. The project was constructed by a joint venture (JV) of four South American contractors and consisted of the following key components: Treatment plant: A 16-ha (39-acre) area was cleared for the construction of a treatment plant to purify 900,000 m3/day (1.2 million cu ft/d) of raw water from the Parana River and distribute it to the surrounding communities.
机译:Sistema de Potabilizacion Area Norte项目(北部地区净化系统)是阿根廷布宜诺斯艾利斯省饮用水系统的重大扩展。该项目的目的是运输和净化巴拉那河的原水,为该省北部的五个社区提供饮用水,使多达200万人受益。该项目由四个南美承包商的合资企业(JV)建造,包括以下关键组成部分:处理厂:清理了16公顷(39英亩)的区域,用于建设净化90万立方米的处理厂/天(120万立方英尺/天)的水来自巴拉那河,并将其分配给周围的社区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号