首页> 外文期刊>Mining Engineering >Coeur d'Alene Mines reports gold-silver discovery at Cerro Bayo
【24h】

Coeur d'Alene Mines reports gold-silver discovery at Cerro Bayo

机译:Coeur d'Alene Mines报告了Cerro Bayo的金银发现

获取原文
获取原文并翻译 | 示例
           

摘要

Coeur d'Alene Mines has discovered additional high-grade gold and silver mineralization at its Cerro Bayo property in southern Chile.During construction of the upper access ramp, the company intersected a 3.5-m (11-ft) section of the Celia vein structure. It averaged 37 g/t (1.08 oz/st) gold equivalent, Coeur d'Alene Mines said. This high-grade zone was intersected about 75m (245 ft) below the surface.The Cerro Bayo development program remains on schedule for a May start-up, said Dennis Wheeler, Coeur d'Alene Mines' chairman, president and chief executive officer. Production in 2002 is forecasted to be 1.86 t (60,000 oz) gold equivalent at a cash cost of less than 4.80 dollars/g (150 dollars/oz).
机译:Coeur d'Alene矿业公司在智利南部的Cerro Bayo矿场发现了其他高档金和银矿化。在上层入口坡道的建设过程中,该公司与Celia矿脉结构相交了3.5米(11英尺)的断面。 Coeur d'Alene Mines说,平均金当量为37克/吨(1.08盎司/ st)。该高品位区域相交于地表以下约75m(245 ft).Coeur d'Alene Mines董事长,总裁兼首席执行官丹尼斯·惠勒(Dennis Wheeler)表示,塞罗巴约(Cerro Bayo)开发计划仍按计划于5月启动。预计2002年的黄金产量为1.86吨(60,000盎司),现金成本低于4.80美元/克(150美元/盎司)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号