...
首页> 外文期刊>Mining Engineering >U.S. longwall development projected to increase
【24h】

U.S. longwall development projected to increase

机译:美国长墙开发预计将增加

获取原文
获取原文并翻译 | 示例
           

摘要

Continued progress in terms of LW face operational efficiency is anticipated, although LW mine productivity may remain in its present flat plateau. Boyd anticipates, based on expected coal production requirements, that LW mine output will increase to record levels during the next five years. And it will account for an even larger portion of U.S. underground output. The long decline in the U.S. LW face census is expected to end with a modest upturn in face numbers by the end of the decade. Development of thin-seam LW technology will continue to be an industry priority. And that is likely to be constrained. Despite operating profit margins that are favorable to new mine development, the outlook for greenfield LW projects is limited. Boyd projects five new greenfield LW projects by 2010.
机译:尽管LW矿山的生产率可能仍保持在目前的平稳水平,但预计在LW采煤作业效率方面将继续取得进展。博伊德预计,基于预期的煤炭生产需求,轻煤的产量将在未来五年内达到创纪录的水平。它将占美国地下产出的更大一部分。美国LW面部普查的长期下降预计将在该十年末以面部人数的适度上升而结束。薄缝轻量化技术的发展将继续是行业的重点。这很可能会受到限制。尽管经营利润率有利于新矿山的开发,但绿地轻煤项目的前景有限。到2010年,博伊德(Boyd)计划开发五个新的绿地轻工项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号