...
首页> 外文期刊>Mining Engineering >Molybdenum mine proposed for British Columbia
【24h】

Molybdenum mine proposed for British Columbia

机译:为不列颠哥伦比亚省提议的钼矿

获取原文
获取原文并翻译 | 示例
           

摘要

Adanac Moly has completed a feasibility study of its Ruby Creek molybdenum project in British Columbia. Ruby Creek is located about 22 km (14 miles) northeast of Atlin at an elevation of 1,500 m (4,900 ft). The study, conducted by Wardrop Engineering, calls for an openpit operation with a stripping ratio of 0.95:1. The milling rate would be 20 kt/d (22,000 stpd). Capital costs for the proposed Ruby Creek Mine are 434.4 million Canada dollars. During its 21-year life, the project would be designed to mill 143.7 Mt (158.4 million st) of molybdenum at an average grade of 0.059 percent. The feasibility study calls for an average recovery of 89 percent, producing 76 kt (167.4 million lbs) of molybdenum.
机译:Adanac Moly已完成了其在不列颠哥伦比亚省的Ruby Creek钼项目的可行性研究。 Ruby Creek位于Atlin东北约22公里(14英里)处,海拔1,500 m(4,900英尺)。由Wardrop Engineering进行的这项研究要求露天作业的提纯率为0.95:1。研磨速度为20 kt / d(22,000 stpd)。拟议的Ruby Creek矿的资本成本为4.344亿加元。在其21年的使用寿命中,该项目将设计为以平均品位0.059%研磨143.7 Mt(1.584亿st)的钼。可行性研究要求平均回收率89%,生产76克拉(1.674亿磅)钼。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号