...
首页> 外文期刊>Mining Engineering >An integrated mine plan: Connecting long-, medium- and short-term planning
【24h】

An integrated mine plan: Connecting long-, medium- and short-term planning

机译:综合矿山计划:连接长期,中期和短期计划

获取原文
获取原文并翻译 | 示例
           

摘要

Goldcorp is one of the largest gold producers in the world with projects in South, Central and North America. Goldcorp's flagship operation is Penasquito, a world class, polymetallic deposit that started production in 2010 and is one of the largest mines in Mexico. Since the early stages of the project, Goldcorp has used the most advanced technologies available to maximize its value. However, the implementation of optimum mine plans has been challenging to put into practice. This is due to the fact that the mine operation involves more complexity than the plans usually reflect. This challenge is an industry-wide issue that presents opportunities for improvement. This article discusses the mine planning methodologies and procedures used to connect long-, medium-and short-term planning strategies in order to bridge the gap and produce optimum mine plans that can be practically implemented in the field.
机译:Goldcorp是全球最大的黄金生产商之一,在南美,中美洲和北美设有项目。 Goldcorp的旗舰业务是Penasquito,这是世界一流的多金属矿床,于2010年开始生产,是墨西哥最大的矿山之一。从项目初期开始,Goldcorp就使用了最先进的技术来最大化其价值。然而,实施最佳的矿山计划一直难以实施。这是由于这样一个事实,即矿山运营所涉及的复杂性超出了计划通常所反映的。这一挑战是整个行业的问题,它带来了改进的机会。本文讨论了用于连接长期,中期和短期计划策略的地雷计划方法和程序,以弥合差距并制定可在现场实际实施的最佳地雷计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号