...
首页> 外文期刊>Mining Engineering >Black Thor project suspended; Stalled talks with Ontario government halts $3.3-billion project
【24h】

Black Thor project suspended; Stalled talks with Ontario government halts $3.3-billion project

机译:黑雷神项目暂停;与安大略省政府的停滞谈判中止了33亿加元的项目

获取原文
获取原文并翻译 | 示例
           

摘要

CLIFFS NATURAL Resources Inc. announced that it will suspend work on the Black Thor project, a $3.3-billion chromite mining project in northwestern Ontario, because of stalled talks with the Ontario provincial government and other political and regulatory problems, Reuters reported. The announcement is a setback for the development of the Ring of Fire area, a large cluster of mineral deposits about 1,500 km (1,000 miles) northwest of Toronto, that Canadian political leaders have said could bring economic development to northern Ontario in the same way as oil sands have to northern Alberta.
机译:据路透社报道,由于与安大略省政府的谈判陷入僵局以及其他政治和监管问题,CLIFFS NATURAL Resources Inc.宣布将暂停在安大略省西北部耗资33亿加元的铬铁矿开采项目Black Thor项目。该声明是火环地区发展的挫折,火环地区是多伦多西北约1,500公里(1,000英里)的一大堆矿床,加拿大政治领导人表示,这可能会以与安大略省北部相同的方式带来经济发展油砂必须运到艾伯塔省北部。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号