...
首页> 外文期刊>Mining Engineering >Coeur d,Alene Mines closer to putting world's largest silwer mine into production
【24h】

Coeur d,Alene Mines closer to putting world's largest silwer mine into production

机译:Coeur d'Alene矿山即将投产世界上最大的银矿

获取原文
获取原文并翻译 | 示例
           

摘要

Coeur d'Alene Mines got closer to putting its San Bartolome silver mine into full production in Bolivia by intro-ducing ore to the mill.The San Bartolome Mine is ex-pected to be the largest pure silver mine in the world when it reaches full capacity of 280 t/a (9 million oz/year).Coeur d'Alene president and chief executive officer Dennis Wheeler said the mine is expected to produce 186 t (6 million oz) of silver this year.San Bartolome is expected to add almost 40 percent to the group's output this year already, Wheeler said.The firm also has two other de-velopment projects in the pipeline, the Palmarejo silver/gold project in Mexico, and the Kensington mine, in Alaska.A third party review of the feasibility study on Palmarejo is expected to be completed by mid-year, with first production targeted in the first half of 2009.Coeur is aiming for a yearly output of about 326 t (10.5 mil-lion oz) of silver and some 3.6 t (115,000 oz) of gold from Pal-marejo.
机译:Coeur d'Alene矿山通过向该矿场介绍矿石,将其玻利维亚的San Bartolome银矿全部投入生产。圣Bartolome矿有望在满矿时成为世界上最大的纯银矿。产能为280吨/年(900万盎司/年).Coeur d'Alene总裁兼首席执行官丹尼斯·惠勒(Dennis Wheeler)表示,预计该矿今年将生产186吨(600万盎司)的白银,圣巴托洛梅预计将增加惠勒说,该公司今年的产量已经接近该集团总产量的40%,该公司还有另外两个开发项目,分别是墨西哥的Palmarejo银/金项目和阿拉斯加的Kensington矿。 Palmerjo的可行性研究预计将在年中完成,第一批生产计划于2009年上半年完成。Coeur的目标是年产约326吨(1050万盎司)的银和约3.6吨白银。 (115,000盎司)来自Pal-marejo的黄金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号