Modification of planning conditions at Priors Hall Quarry by Corby Developments Ltd was approved by Northamptonshire CC in July. The proposals would extract clay and 1.2Mt of limestone. The site is covered by a Ministerial planning permission granted in 1953 which allowed the extraction of ironstone and any mineral above the ironstone for use by the iron and steel industry based in Corby; limestone and clay therefore can be worked. The site has remained dormant although it could have been worked if regarded as economically viable. In 1997 an application was submitted for the approval of modern planning conditions at the Priors Hall site. This application was subsequently granted and currently forms the planning permission for the site, allowing it to be worked until 2042.
机译:北安普敦郡CC于7月批准了由Corby Developments Ltd修改Priors Hall Quarry的规划条件。该提案将提取粘土和1.2Mt的石灰石。该地点由1953年授予的部长级规划许可所覆盖,允许开采铁矿石和铁矿石上的任何矿物,供科比钢铁公司使用;因此可以加工石灰石和粘土。该站点一直处于休眠状态,但如果被认为在经济上可行,则可以进行工作。 1997年,在Priors Hall现场提交了批准现代规划条件的申请。此申请随后获得了批准,目前构成该站点的规划许可,允许其工作到2042年。

著录项

  • 来源
    《Mineral Planning》 |2006年第109期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号